好看的中文字幕av,巨尻av在线,亚洲网视频,逼特视频,伊人久久综合一区二区,可以直接观看的av网站,天堂中文资源在线观看

 
 

Home/News

Bridge Crane Gantry completed in Houay Lamphan Gnai Hydropower Station ahead of schedule

Updated: 2013-07-26

On July 18, the CGGC-undertaken power plant of Houay Lamphan Gnai Hydropower Station in Laos completed concrete casting of the bridge crane gantry 43 days ahead of schedule.

The gantry was designed to be a twelve-truss prefabricated structure with a maximum weight of 14 tons. The Project Department did this work by on-site casting thus ensured both efficiency and structural safety, and facilitated the following installation of the steel roof trusses and generator units.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.