好看的中文字幕av,巨尻av在线,亚洲网视频,逼特视频,伊人久久综合一区二区,可以直接观看的av网站,天堂中文资源在线观看

 
 

Home/News

CEEC-constructed Pakistan Jinnah Hydropower Station connected to the grid

Updated: 2013-10-12

On Oct 9 the CEEC-constructed Pakistan Jinnah Hydropower Station was connected to the power grid, with all of its eight generating units put into commercial operation.

Construction of the power station was commenced in December 2006, and the first generating unit began to supply power to the grid in January 2012. After two months’ trial operation, the last two units were connected to the grid on Oct 9, 2013.

As a major national power project in Pakistan, the Jinnah Hydropower Station is of great significance for easing the country’s power shortage. It is a low-water-head tubular turbine power station equipped with 8*12MW pit-type tubular turbine units, reaching a total installed capacity of 96 MW.

 

Links Privacy Statement Terms of Use Contact Us

Copyright@2013 China Gezhouba (Group) Corporation. All rights reserved.